Projects / Herrera, Asunción

Inarco Herrera

Under construction Developer: Inarco Delivery: Abril 2028

Located in a neighborhood where the memory of the quiet residential life still coexists with the booming commercial movement, we decided to propose a tower that seeks to be a safe and cost-effective alternative, through noble and traditional materials such as brick and concrete, which manages to be harmoniously inserted into its environment.

Unit types

  • Monoambiente · 0 bed · 30 m²From USD 47.900
  • 1 Dorm A · 1 bed · 44 m²From USD 69.800
  • 1 Dorm Plus · 1 bed · 50 m²From USD 79.100
  • 2 Dormitorios · 2 bed · 71 m²From USD 113.100

Amenities

  • Gym
  • Swimming Pool
  • Quincho climatizado
  • Co-working